Vinaora Nivo SliderVinaora Nivo SliderVinaora Nivo SliderVinaora Nivo Slider

LANDWEHR TO WAGERUP 330KV TRANSMISSION LINE PROJECT

Pinjarra Crane and Access Hire has completed a 5 month 330kV transmission line project as a key business partner for John Holland Power.

From the initial phase of pre-assembly of tower components through to tower erection, stringing, tensioning and all other facets of work associated with this project. Pinjarra Crane and Access Hire was able to supply cranes, access equipment and labour to John Holland Power. Pinjarra Crane and Access Hire completed all lift studies, site inspections and crane suitability studies for John Holland Power to ensure the project was completed to a high standard and within the safety guidelines.

With up to 9 cranes at its peak, Pinjarra Crane and Access Hire successfully managed crane requirements for the project. Chris Fairman provided onsite supervision as well as one point of contact for all crane requirements for the duration of the project.